-
About Us
-
-
-
NEWS
STBD
08
2023
-
03
Installation Requirements
Author:
The power equipment, transducer and load equipment should be installed on a solid foundation to avoid excessive vibration, otherwise data instability may occur, reducing the measurement accuracy or even damaging the transducer.
(1) The torque transducer can be installed horizontally or vertically.
(2) The power equipment, transducer and load equipment should be installed on a solid foundation to avoid excessive vibration, otherwise data instability may occur, reducing the measurement accuracy or even damaging the transducer.
(3) Use elastic pin coupling or rigid coupling to connect.
(4) The concentricity of the axes of power equipment, sensor and load equipment should be less than Φ0.05mm.
Previous Page
Next Page
Previous Page
Next Page
2023-03-08
Specializing in mechanical sensing technology research and development, production, sales and after-sales as one of the enterprises. The company has many years of professional and technical team
Sentong Bada Technology
Service Hotline:
Production base:
1003, Building C05, Venture Headquarters Base, North of Fuyuan Road, Wuqing Development Zone, Tianjin
Copyright©2023 Sentong Bada Technology